Roadwork Notice Update: August 25th 2023

By contributor,
Roadworksm

Roadwork is scheduled to continue on the following streets.

Appaloosa Cir
Ridge Rd
Breakneck Hill Rd
Glen Rd- From Lumber St (S) to Breakneck Hill (W)
Gibbon Rd

Dates are subject to change due to weather conditions.

8/28-9/1 - Adjust structures to grade and adjust sidewalk ramps.
8/30-9/5 - Excavate and install asphalt binder course in cul de sacs and intersections where the cold in place recycling equipment could not do.
9/6-9/8 - Install the top course of asphalt on the full length of each project.

Work hours will be approximately 7a-5p.

Please use caution as all structures will be raised above the existing pavement 1 ½” in preparation for the installation of the surface course of asphalt.

Please expect delays and seek alternate routes when possible.